We’re back for Part 2 of wall building in Ms. Merry!   In our last chapter, we’d just gotten the main cabinet wall in place, now, we’re back with the rest of the inner bathroom wall put together!

P1080858P1080859P1080863

Since we’re only reusing a small section of the original bathroom, I had to build an upper wall to house our medicine cabinet.   Like everything, its made of a combination of 2x2 and 2x3 lumber, the 2x3 at the bottom there to add a couple sections of 2x3 ledge to go under the bottom of the sink frame so that the fiberglass is fully supported since it no longer has the rigidity that came from the full clamshell enclosure.  

P1080870P1080872

Ms. Merry’s medicine cabinet is another donation from Mr. KIT, a new medicine cabinet was bought that was the original smaller size I had originally installed in Mr. KIT back when the bathroom was first remodeled.  This larger, somewhat nicer medicine cabinet with adjustable shelves was the replacement I ended up later getting due to me being a moron and not making a shower curtain that went in front of the cabinet to keep the water from soaking the cardboard backer.    Another thing we’re doing differently is in Merry, the cabinet is recessed into the wall, giving us a better line of access to the sink and making it easier to hopefully get a spring loaded latch to keep it shut vs the bungee cord job I was using with Mr. KIT.  

P1080861P1080866P1080867P1080868P1080869

We’re later on going to use the grinder to taper the fiberglass on the back edges of the section being reused so that they more easily slip under the FRP board that will make the walls and floor of the wet bath.  

You can also see the faucet assembly we’re using temporarily installed for visualization purposes and pipe planning.   We’re going to be using two faucets in the bathroom, the original sink faucet is going to be replaced with a nice standard bathroom faucet.   The shower head will be attached to this nice chromed solid brass outdoor shower assembly we picked up.

I haven’t decided on if I’m  going to go with galvanized pipe painted with chrome paint to go between the faucet and the point on the sink where they’ll pass through and connect to the camper’s pex plumbing, or use stainless steel braided water lines and simply use brass connection points coming up through the sink top.  


Sadly, there’s going to be a bit of a delay before the next post, I’m going to be out of town this weekend, so sadly, no additional work will be done till the following monday.  


When we come back, we’ll be resuming work on the waste tank and ABS sewer plumbing work, as we now have enough of the bathroom walls in place to route the pipes that are going to the holding tank in the rear, allowing us to finally get the tank compartment done.   Since the summer doesn’t last forever, I’ll be working on jobs that will allow me to get all exterior related work finished before we lose the weather again, but allow for Merry to be finished over the winter if we can’t get her done by the time the weather turns south. 